Republic of the Philippines · Official website of the Provincial Government of Davao Oriental

Province ofDavao Oriental — home page
Digital Services

Menu

Project monitoring portal

Provincial projects, monitored in the open

Every published project with its location, implementing office, budget and status. Physical accomplishment and financial accomplishment are different measures and are always shown separately.

40 of 40 projects

Summary of the projects listed

Projects listed
40
all published projects
Ongoing
15
11 planned or under procurement
Completed
11
2 suspended · 1 terminated
Approved budget
₱1.5B
37 of 40 projects disclose a budget

Projects listed, by implementation status

Number of projects

Planned: 6 (15%)6Under procurement: 5 (12.5%)5Ongoing: 15 (37.5%)15Completed: 11 (27.5%)11Suspended: 2 (5%)Terminated: 1 (2.5%)
  • Planned6
  • Under procurement5
  • Ongoing15
  • Completed11
  • Suspended2
  • Terminated1
View data as table
Projects listed, by implementation status
Implementation statusProjects
Planned6
Under procurement5
Ongoing15
Completed11
Suspended2
Terminated1
Download CSV

40 projects

Sorted by project, descending · page 1 of 2

Monitored projects. Select a column heading to sort. Physical accomplishment is work done; financial accomplishment is funds disbursed — both from the latest validated monitoring report.
ProjectPriorityLocationImplementing officeStatusPhysicalFinancialApproved budgetLast monitored
[Demo] Watershed reforestation — Boston (sample 38)DEMO-2026-038Demonstration dataEnvironmental ProtectionBostonBrgy. PoblacionProvincial Engineer's OfficeUnder procurementNot yet validatedNot yet validated₱69,900,000.00Not yet monitored
[Demo] Water supply pipeline extension — Baganga (sample 15)DEMO-2026-015Demonstration dataWaterBagangaBrgy. BatianoProvincial Engineer's OfficeOngoing44.8%37.7%₱22,700,000.00
[Demo] Visitor information centre — Baganga (sample 01)DEMO-2026-001Demonstration dataTourismBagangaBrgy. BatianoProvincial Tourism OfficeOngoing62.1%54.9%₱68,300,000.00
[Demo] Tourism access road improvement — Cateel (sample 02)DEMO-2024-002Demonstration dataTourismCateelBrgy. San VicenteProvincial Engineer's OfficeCompleted100%93.1%₱46,900,000.00
[Demo] Student support facility — Manay (sample 32)DEMO-2026-032Demonstration dataEducationManayBrgy. CentralProvincial Education and Scholarship ProgramOngoing28%22%Not yet disclosed
[Demo] Spring development and reservoir — Lupon (sample 14)DEMO-2025-014Demonstration dataWaterLuponBrgy. PoblacionProvincial Engineer's OfficeSuspended31.5%27.7%₱24,300,000.00
[Demo] Solar street lighting — Manay (sample 18)DEMO-2025-018Demonstration dataElectrificationManayBrgy. San IsidroProvincial Engineer's OfficeOngoing44.9%35.6%₱21,200,000.00
[Demo] Skills training centre — Cateel (sample 31)DEMO-2026-031Demonstration dataEducationCateelBrgy. BaybayProvincial Education and Scholarship ProgramUnder procurementNot yet validatedNot yet validated₱41,800,000.00Not yet monitored
[Demo] Sitio electrification — Cateel (sample 17)DEMO-2026-017Demonstration dataElectrificationCateelBrgy. PoblacionProvincial Engineer's OfficeUnder procurementNot yet validatedNot yet validated₱6,900,000.00Not yet monitored
[Demo] School building repair — Lupon (sample 29)DEMO-2026-029Demonstration dataEducationLuponBrgy. IlangayProvincial Education and Scholarship ProgramOngoing69.3%62%₱72,100,000.00
[Demo] Road slope protection works — Tarragona (sample 11)DEMO-2026-011Demonstration dataTransportationTarragonaBrgy. MagandaProvincial Engineer's OfficePlannedNot yet validatedNot yet validated₱43,100,000.00Not yet monitored
[Demo] Rainwater collection facility — Cateel (sample 16)DEMO-2023-016Demonstration dataWaterCateelBrgy. San VicenteProvincial Engineer's OfficeCompleted100%89.3%₱37,800,000.00
[Demo] Public transport terminal improvement — Caraga (sample 12)DEMO-2026-012Demonstration dataTransportationCaragaBrgy. San JoseProvincial Engineer's OfficeOngoing77.8%74.2%₱18,200,000.00
[Demo] Public market rehabilitation — Boston (sample 23)DEMO-2026-023Demonstration dataInfrastructureBostonBrgy. CabasaganProvincial Engineer's OfficeOngoing69%60.6%₱25,000,000.00
[Demo] Public building repair — San Isidro (sample 22)DEMO-2023-022Demonstration dataInfrastructureSan IsidroBrgy. ManiklingProvincial Engineer's OfficeCompleted100%78.9%₱11,000,000.00
[Demo] Provincial road concreting — Boston (sample 09)DEMO-2025-009Demonstration dataTransportationBostonBrgy. PoblacionProvincial Engineer's OfficeCompleted100%80.6%₱23,700,000.00
[Demo] Off-grid solar home systems — Banaybanay (sample 19)DEMO-2023-019Demonstration dataElectrificationBanaybanayBrgy. PanikianProvincial Engineer's OfficeCompleted100%90.2%Not yet disclosed
[Demo] Multi-purpose building — Mati (sample 21)DEMO-2026-021Demonstration dataInfrastructureCity of MatiBrgy. CentralProvincial Engineer's OfficeOngoing73.3%68%₱19,200,000.00
[Demo] Medical equipment provision — Caraga (sample 27)DEMO-2026-027Demonstration dataHealthCaragaBrgy. PoblacionProvincial Health OfficePlannedNot yet validatedNot yet validated₱35,100,000.00Not yet monitored
[Demo] Materials recovery facility — Governor Generoso (sample 39)DEMO-2026-039Demonstration dataEnvironmental ProtectionGovernor GenerosoBrgy. Crispin Dela CruzProvincial Environment and Natural Resources OfficeOngoing53.3%45.1%₱44,200,000.00

Figures on this page are published only after validation by the Provincial Planning and Development Office. Targets are shown as planned figures; reports still awaiting validation are not shown. Physical accomplishment measures work done; financial accomplishment measures funds disbursed against the budget — the two are reported separately.