Republic of the Philippines · Official website of the Provincial Government of Davao Oriental

Province ofDavao Oriental — home page
Digital Services

Menu

Project monitoring portal

Provincial projects, monitored in the open

Every published project with its location, implementing office, budget and status. Physical accomplishment and financial accomplishment are different measures and are always shown separately.

40 of 40 projects

Summary of the projects listed

Projects listed
40
all published projects
Ongoing
15
11 planned or under procurement
Completed
11
2 suspended · 1 terminated
Approved budget
₱1.5B
37 of 40 projects disclose a budget

Projects listed, by implementation status

Number of projects

Planned: 6 (15%)6Under procurement: 5 (12.5%)5Ongoing: 15 (37.5%)15Completed: 11 (27.5%)11Suspended: 2 (5%)Terminated: 1 (2.5%)
  • Planned6
  • Under procurement5
  • Ongoing15
  • Completed11
  • Suspended2
  • Terminated1
View data as table
Projects listed, by implementation status
Implementation statusProjects
Planned6
Under procurement5
Ongoing15
Completed11
Suspended2
Terminated1
Download CSV

40 projects

Sorted by project, ascending · page 1 of 2

Monitored projects. Select a column heading to sort. Physical accomplishment is work done; financial accomplishment is funds disbursed — both from the latest validated monitoring report.
ProjectPriorityLocationImplementing officeStatusPhysicalFinancialApproved budgetLast monitored
[Demo] Barangay health station — Tarragona (sample 26)DEMO-2025-026Demonstration dataHealthTarragonaBrgy. MagandaProvincial Engineer's OfficeOngoing63.8%50.8%₱58,900,000.00
[Demo] Birthing facility upgrade — Lupon (sample 28)DEMO-2023-028Demonstration dataHealthLuponBrgy. IlangayProvincial Health OfficeCompleted100%95.5%₱45,300,000.00
[Demo] Bridge rehabilitation — Governor Generoso (sample 10)DEMO-2026-010Demonstration dataTransportationGovernor GenerosoBrgy. Crispin Dela CruzProvincial Engineer's OfficeOngoing81.6%67.7%₱68,900,000.00
[Demo] Coastal boardwalk and view deck — Manay (sample 03)DEMO-2026-003Demonstration dataTourismManayBrgy. CentralProvincial Tourism OfficePlannedNot yet validatedNot yet validated₱5,000,000.00Not yet monitored
[Demo] Community tourism livelihood facility — Banaybanay (sample 04)DEMO-2026-004Demonstration dataTourismBanaybanayBrgy. San VicenteProvincial Tourism OfficeOngoing38.7%36%₱78,300,000.00
[Demo] Crop processing centre — Mati (sample 06)DEMO-2026-006Demonstration dataAgricultureCity of MatiBrgy. BadasProvincial Engineer's OfficeOngoing68.8%64.3%Not yet disclosed
[Demo] Distribution line extension — Mati (sample 20)DEMO-2026-020Demonstration dataElectrificationCity of MatiBrgy. MatiaoProvincial Engineer's OfficePlannedNot yet validatedNot yet validated₱31,700,000.00Not yet monitored
[Demo] Drainage system improvement — Governor Generoso (sample 24)DEMO-2026-024Demonstration dataInfrastructureGovernor GenerosoBrgy. Manuel RoxasProvincial Engineer's OfficeUnder procurementNot yet validatedNot yet validated₱76,700,000.00Not yet monitored
[Demo] Early warning system installation — Banaybanay (sample 34)DEMO-2026-034Demonstration dataDisaster PreparednessBanaybanayBrgy. PoblacionProvincial Engineer's OfficePlannedNot yet validatedNot yet validated₱47,400,000.00Not yet monitored
[Demo] Emergency operations equipment — San Isidro (sample 36)DEMO-2025-036Demonstration dataDisaster PreparednessSan IsidroBrgy. BatobatoProvincial Disaster Risk Reduction and Management OfficeSuspended30.5%26.6%₱37,900,000.00
[Demo] Evacuation centre — Manay (sample 33)DEMO-2025-033Demonstration dataDisaster PreparednessManayBrgy. CayawanProvincial Disaster Risk Reduction and Management OfficeCompleted100%85.5%₱16,800,000.00
[Demo] Farm-to-market road improvement — Banaybanay (sample 05)DEMO-2024-005Demonstration dataAgricultureBanaybanayBrgy. PoblacionProvincial Agriculture OfficeCompleted100%81.9%₱41,000,000.00
[Demo] Fish landing facility upgrade — San Isidro (sample 07)DEMO-2026-007Demonstration dataAgricultureSan IsidroBrgy. MaagProvincial Agriculture OfficeUnder procurementNot yet validatedNot yet validated₱54,400,000.00Not yet monitored
[Demo] Flood control structure — Mati (sample 35)DEMO-2025-035Demonstration dataDisaster PreparednessCity of MatiBrgy. SainzProvincial Disaster Risk Reduction and Management OfficeOngoing77%64.6%₱9,200,000.00
[Demo] Hospital ward improvement — Governor Generoso (sample 25)DEMO-2023-025Demonstration dataHealthGovernor GenerosoBrgy. Upper TibanbanProvincial Health OfficeCompleted100%81.1%₱79,800,000.00
[Demo] Irrigation canal rehabilitation — Boston (sample 08)DEMO-2025-008Demonstration dataAgricultureBostonBrgy. CawayananProvincial Agriculture OfficeOngoing51.6%43.4%₱69,200,000.00
[Demo] Learning resource centre — Baganga (sample 30)DEMO-2025-030Demonstration dataEducationBagangaBrgy. BatianoProvincial Engineer's OfficeTerminated21.8%20.2%₱34,500,000.00
[Demo] Level II water system — Caraga (sample 13)DEMO-2023-013Demonstration dataWaterCaragaBrgy. Palma GilProvincial Engineer's OfficeCompleted100%94.1%₱42,200,000.00
[Demo] Mangrove rehabilitation — San Isidro (sample 37)DEMO-2023-037Demonstration dataEnvironmental ProtectionSan IsidroBrgy. ManiklingProvincial Environment and Natural Resources OfficeCompleted100%84.7%₱46,400,000.00
[Demo] Marine protected area support — Tarragona (sample 40)DEMO-2026-040Demonstration dataEnvironmental ProtectionTarragonaBrgy. CabagayanProvincial Environment and Natural Resources OfficePlannedNot yet validatedNot yet validated₱50,400,000.00Not yet monitored

Figures on this page are published only after validation by the Provincial Planning and Development Office. Targets are shown as planned figures; reports still awaiting validation are not shown. Physical accomplishment measures work done; financial accomplishment measures funds disbursed against the budget — the two are reported separately.